3-86 ENGINE WATER PUMP • Apply SUZUKI SUPER GREASE “A” to the O-ring.  Use a new O-ring to prevent oil leakage. 99000-25030: SUZUKI SUPER GREASE “A” (USA) 99000-25010: SUZUKI SUPER GREASE “A” (Others) • Tighten the water pump mounting bolts 1 to the specified torque. Water pump mounting bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft) NOTE: Pass the gear position switch lead wire 2 under the water pump rib and clamp the gear position switch lead wire. • Apply engine coolant to the O-ring. E  L Use a new O-ring to prevent engine coolant leakage. P M A • Install the water inlet cover 3.S Water inlet cover bolt: 10 N·m (1.0 kgf-m, 7.0 lb-ft) GENERATOR ROTOR • Degrease the tapered portion A of generator rotor and also the crankshaft B. Use nonflammable cleaning solvent to wipe off oily or greasy matter and make these surfaces completely dry.

Suzuki GSXR 1000 K5 K6 - Page 140 Suzuki GSXR 1000 K5 K6 Page 139 Page 141