EXHAUST SYSTEM 6-9 • Make the No. 2 cable straight and turn in the cable adjuster 5 fully. • Loosen the lock-nuts 6 and turn the No.2 cable adjuster 7 in or out until the inner cable length C becomes 62 – 63 mm (2.44 – 2.48 in). • After adjusting the inner cable length C, tighten the lock-nuts 6. • Connect the No. 1 cable and No. 2 cable to the EXCVA pul- E ley. (6-6) L • Check the EXCVA to adjustment position. (6-4) P Do not use the adjustable wrench to turn EXCVA pul- M ley so as not to cause damage to the internal gear of EXCVA. A • Install the pulley 8 to the shaft 9. S NOTE: Make sure that the shaft’s line D and cable slots E facing upward as shown. • Hold the EXCVA pulley with an adjustable wrench, and then tighten the pulley mounting bolt to the specified torque. EXCVA pulley mounting bolt: 5 N·m (0.5 kgf-m, 3.5 lb-ft) When loosening or tightening the pulley bolt, be sure to fix the pulley with an adjustable wrench, or EXCVA may get damaged.
Suzuki GSXR 1000 K5 K6 Page 294 Page 296